Iranian Multi Complex Center

Facade Enginnering & Construction

Project ID


Project title : Iranian Multi Complex Center

Project location : Tehran, Valiasr Street – North of Sa’ei Park

Land area : 1,160 sq. meters

Facade Area : 5,000 sq. meters

Usage : Commercial

Design team : Parto Engineering Office

Employer : Asfalt Tous Company

Facade System :Curtain Wall

Auxiliary Materials :Louvers, Cement Board + Microcement

Specialized Glazing Installation: The Steel Trestle Method

Due to the unique architectural design, the presence of scaffolding, metal substructures, or fixed obstacles, and the lack of sufficient space for transporting glass from the ground floor to the installation point, the use of electric suction cups (glazing robots) was not possible in this facade project.

Therefore, the Steel Trestle (H-Rack) Installation Method was successfully employed. In this technique, the glass panel is loaded onto a specialized steel trestle to be guided with maximum precision through obstacles to the installation location.

This installation method offers key advantages:

  • Space Saving: Ideal for constrained construction sites.
  • High Safety: Provides maximum safety during movement.
  • Risk Prevention: Eliminates the risk of glass falling or detaching due to power failure or sudden impact.

Under Construction